Skip to content

The Future at Jackson Park

For those who aren’t clear on the course changes and the new driving range, here is a link to the Seattle Parks and Recreation schematic; some of which has already been completed. (this schematic does not cover the switch of  holes 7,8,9 and holes 16,17,18. As far as I know that is a permanent change that was made after this schematic)

http://www.seattle.gov/parks/projects/jackson_park/files/schematic_design_20111101.pdf

Jackson Park schematic
Jackson Park schematic